Managed pressure drilling (MPD) was developed as a group of technologies to more precisely control the annular pressure profile for which accuracy of the estimation of the bottomhole pressure is important. Particularly, under severe wave heaves in deepwater environments, the estimation based on static state pipe movement models can result in underestimation/overestimation of bottomhole pressures. The purpose of this study is to investigate the dynamic axial response of the drillstring with friction to applied heaving velocity, with particular interest to the effect at the bottomhole pressure. The paper presents an efficient and accurate method for solving the dynamic axial drillstring with friction and it allows it to be applied to heave velocity at the surface. The model that couples the pipe motion solves the full balance of mass and balance of momentum for pipe and annulus flow, considering the compressibility of the fluids, the elasticity of the system, and the dynamic motions of pipes and fluids. Also considered are surge pressures related to fluid column length below the moving pipe, compressibility of the formation, and axial elasticity of the moving string. Fluid properties are adjusted to reflect the effects of pressure and temperature on the fluids. The modeling takes into account the pipe elasticity under different combinations of heave and pipe velocities. Furthermore, the real-time torque and drag models are calibrated to actual hole conditions in real-time using survey, temperature, pressure, and downhole tool data to calculate friction factors in a wellbore. It has been observed that different conditions exist, some resulting in velocity reversal; thus causing surge or swab pressures. It has also been observed that heave amplitude has significant influence on bottomhole pressure. The different conditions observed for periodic or time function of displacements include (1) surface pipe velocity attributed to wave heave is in phase with the bottom movement of the string; (2) surface velocity of the pipe is out of phase with the bottom velocity of the pipe; (3) wave velocity and surface pipe velocity can be out of sync, and the bottom pipe velocity can be in phase with the surface velocity; and (4) wave velocity and surface pipe velocity can be out of sync, and the bottom pipe velocity can be out of phase with the surface velocity. The results of these calculations can be coupled to a real-time hydraulics model to determine a setpoint pressure for the MPD choke system. (SPE 173|005)
Skip Nav Destination
Article navigation
January 2016
Research-Article
Elastic Pipe Control and Compensation for Managed Pressure Drilling Under Sea Wave Heave Conditions
Randy Lovorn
Randy Lovorn
Search for other works by this author on:
Robello Samuel
Randy Lovorn
Contributed by the Petroleum Division of ASME for publication in the JOURNAL OF ENERGY RESOURCES TECHNOLOGY. Manuscript received May 6, 2015; final manuscript received July 29, 2015; published online September 16, 2015. Editor: Hameed Metghalchi.
J. Energy Resour. Technol. Jan 2016, 138(1): 012903 (9 pages)
Published Online: September 16, 2015
Article history
Received:
May 6, 2015
Revised:
July 29, 2015
Citation
Samuel, R., and Lovorn, R. (September 16, 2015). "Elastic Pipe Control and Compensation for Managed Pressure Drilling Under Sea Wave Heave Conditions." ASME. J. Energy Resour. Technol. January 2016; 138(1): 012903. https://doi.org/10.1115/1.4031452
Download citation file:
Get Email Alerts
Cited By
A Semi-Analytical Rate-Transient Analysis Model for Fractured Horizontal Well in Tight Reservoirs Under Multiphase Flow Conditions
J. Energy Resour. Technol (November 2024)
Experimental Investigation of New Combustion Chamber Geometry Modification on Engine Performance, Emission, and Cylinder Liner Microstructure for a Diesel Engine
J. Energy Resour. Technol (December 2024)
Related Articles
Modeling and Experimental Study of Solid–Liquid Two-Phase Pressure Drop in Horizontal Wellbores With Pipe Rotation
J. Energy Resour. Technol (March,2016)
Drilling Fluid Density and Hydraulic Drag Reduction With Glass Bubble Additives
J. Energy Resour. Technol (July,2017)
Analysis of Wellbore Temperature Distribution and Influencing Factors During Drilling Horizontal Wells
J. Energy Resour. Technol (September,2018)
A Comparative Study of Genetic and Particle Swarm Optimization Algorithms and Their Hybrid Method in Water Flooding Optimization
J. Energy Resour. Technol (October,2018)
Related Proceedings Papers
Related Chapters
A Review on Prediction over Pressured Zone in Hydrocarbon Well Using Seismic Travel Time through Artificial Intelligence Technique for Pre-Drilling Planing
International Conference on Software Technology and Engineering, 3rd (ICSTE 2011)
Well Control
Oilwell Drilling Engineering
Introduction
Mechanics of Drillstrings and Marine Risers