Gas purging, a process of displacing one gas by another gas, occurs on a routine basis in the natural gas industry when pipelines are purged into and out of service. In a project sponsored by the Gas Research Institute and in cooperation with the American Gas Association (A.G.A.), the purging practices as outlined in the A.G.A.’s Purging Principles and Practices manual were reviewed because many of today’s pipeline purging operations occur under conditions not addressed directly in the manual. The program focus is on the purging procedures outlined in Chapter 8 of the manual entitled “Gas Transmission and Distribution Pipes.” The technical objective of the Project was to develop an understanding of the scientific principles upon which safe, practical purging practices can be based. Direct displacement and inert gas slug purging operations are explained in terms of dispersion and mixing parameters and their relationship to the gas velocity. Field data compared to the results of an analytical mixing model. Computer software for planning safe and cost-effective pipeline purges has been developed. Finally, recommendations for revising Chapter 8 of the A.G.A. manual are presented.
Skip Nav Destination
Article navigation
November 1998
Research Papers
Pipeline Purging Principles and Practice
J. E. Johnson,
J. E. Johnson
Southwest Research Institute, 6220 Culebra Road, P.O. Drawer 28510, San Antonio, TX 78228-0510
Search for other works by this author on:
S. J. Svedeman,
S. J. Svedeman
Southwest Research Institute, 6220 Culebra Road, P.O. Drawer 28510, San Antonio, TX 78228-0510
Search for other works by this author on:
C. A. Kuhl,
C. A. Kuhl
Southwest Research Institute, 6220 Culebra Road, P.O. Drawer 28510, San Antonio, TX 78228-0510
Search for other works by this author on:
J. G. Gregor,
J. G. Gregor
Gas Research Institute, 8600 West Bryn Mawr Avenue, Chicago, IL 60631
Search for other works by this author on:
A. K. Lambeth
A. K. Lambeth
Texas Eastern Transmission Corporation, 5400 Westheimer Court, Houston, TX 77056-5310
Search for other works by this author on:
J. E. Johnson
Southwest Research Institute, 6220 Culebra Road, P.O. Drawer 28510, San Antonio, TX 78228-0510
S. J. Svedeman
Southwest Research Institute, 6220 Culebra Road, P.O. Drawer 28510, San Antonio, TX 78228-0510
C. A. Kuhl
Southwest Research Institute, 6220 Culebra Road, P.O. Drawer 28510, San Antonio, TX 78228-0510
J. G. Gregor
Gas Research Institute, 8600 West Bryn Mawr Avenue, Chicago, IL 60631
A. K. Lambeth
Texas Eastern Transmission Corporation, 5400 Westheimer Court, Houston, TX 77056-5310
J. Offshore Mech. Arct. Eng. Nov 1998, 120(4): 249-256 (8 pages)
Published Online: November 1, 1998
Article history
Received:
April 1, 1998
Revised:
May 21, 1998
Online:
December 17, 2007
Citation
Johnson, J. E., Svedeman, S. J., Kuhl, C. A., Gregor, J. G., and Lambeth, A. K. (November 1, 1998). "Pipeline Purging Principles and Practice." ASME. J. Offshore Mech. Arct. Eng. November 1998; 120(4): 249–256. https://doi.org/10.1115/1.2829548
Download citation file:
Get Email Alerts
Cited By
Slamming characteristics of a rigid wedge during symmetric and asymmetric water entry
J. Offshore Mech. Arct. Eng
Layout Optimization of Wave Energy Park Based on Multi-Objective Optimization Algorithm
J. Offshore Mech. Arct. Eng
Wear of Wave Energy Converters Mooring Lines Belts
J. Offshore Mech. Arct. Eng (April 2025)
Related Articles
Scaling of Solutions for the Lateral Buckling of Elastic-Plastic Pipelines
J. Offshore Mech. Arct. Eng (August,2009)
A New Method for Prediction of the Transient Force Generated by a
Liquid Slug Impact on an Elbow of an Initially Voided Line
J. Pressure Vessel Technol (January,0001)
Pressure Loss in a Horizontal Two-Phase Slug Flow
J. Fluids Eng (July,2010)
Related Proceedings Papers
Related Chapters
Managing Energy Resources from within the Corporate Information Technology System
Industrial Energy Systems
Introduction
History of Line Pipe Manufacturing in North America
DEVELOPMENTS IN STRAIN-BASED FRACTURE ASSESSMENTS - A PERSPECTIVE
Pipeline Integrity Management Under Geohazard Conditions (PIMG)